wider deck, stronger girders – traffic moving the whole time.
Project Type
Bridge Rehabilitation
Location
Meziadin Junction, BC
Surespan rehabilitated the Taft Creek Bridge on Highway 37, replacing the existing 67 m timber deck and strengthening the existing steel stringers with new steel plates. More than 4,000 Nelson studs were welded to the stringers to accommodate a new, wider precast deck. The failing Pier 3 structure was replaced with new rock-socketed piles and a concrete pile cap, while the existing Pier 1 and 2 pile caps were strengthened and widened to accommodate the new deck. Single-lane alternating traffic was maintained throughout the two-phase construction, including continued passage of heavy mining equipment. The remote location presented additional challenges, with the nearest concrete supplier located five hours from the site.