PRE-DRILLED, HAMMERED, AND CRANKED INTO PLACE — 248 TIMES OVER.
Project Type
Pile Driving
Location
Vanderhoof, BC
Surespan supplied and installed 248 steel pipe piles for the complex BC Hydro PGTC Capacitor Station, using pre-drilling, diesel hammers, and multiple cranes to meet the required construction schedule. Crews completed the piling work in accordance with BC Hydro specifications and site safety requirements.