a permanent crossing built to outlast the industrial traffic it carries.
Project Type
Resource Road Bridge
Location
Hixon, BC
Surespan removed an existing 100 ft glulam bridge and constructed a new 140 ft steel girder bridge with a concrete composite deck on driven pipe pile abutments at km 754.2 on the Naver–Stony Forest Service Road. Surespan also designed, installed, and removed a temporary work bridge to maintain site access, coordinating with environmental and archaeological stakeholders throughout construction in a remote forestry setting.