KEATING CROSSING FLYOVER

Project Type

Structural Steel Fabrication

Location

Victoria, BC

Surespan Structures fabricated and supplied a 203-metre, spiral-curved three-girder steel flyover weighing 545 metric tonnes for installation over Highway 17 in Victoria, BC. The oversized girders were transported to site using Surespan’s specialized steering dolly trailer system. This project highlights Surespan’s capability to fabricate complex curved-geometry steel structures for high-traffic urban infrastructure.