truss repairs on one bridge, deck patching on the other — traffic never stopped on either.
Project Type
Bridge Rehabilitation
Location
Eagle Plains/Dawson City, YT
Surespan performed steel truss repairs, concrete filling of truss members, and guardrail and signage repairs on the remote Eagle River Bridge. Surespan also completed more than 120 square metres of concrete deck patching and concrete curb and rail repairs on the nearby Klondike River Bridge. Single-lane alternating traffic was maintained on both bridges throughout the work, including during high summer traffic volumes on the Klondike River Bridge.



