
Access on demand.
150+ pre-engineered portable bridges, ready to deploy wherever your project needs a crossing.
No crossing? No problem.

Surespan was instrumental in designing and manufacturing the first portable bridges in Canada — and we’ve been getting crews across ever since.
Our pre-engineered steel and timber deck bridges install fast, relocate easily, and solve temporary and semi-permanent crossing challenges for nearly every industry: forestry, mining, pipelines, municipal, and private development. With staging yards in Dawson Creek, Langley, and Duncan, your bridge is never far away.
A fleet for every crossing.
More than 150 bridges, new and used, ready when you are. Standard, oilfield, and low-profile configurations span 20 feet to over 100, single-lane to multi-lane, with steel, concrete, or timber decks. Load ratings cover BCL625, L75, L100, L150, L165, and US equivalents — so whatever you’re moving, we have a bridge rated to carry it.
Engineered to fit.
Every bridge comes with engineered drawings and the certifications your project requires. Standard dimensions deploy in days; when standard won’t work, we design custom spans and bearing capacities to suit. And we don’t just rent — our inventory is available for purchase, and we buy used bridges too.
We don’t just drop it off.
With dedicated crews and our own manufacturing facilities, we handle transport, installation, and removal — and keep your project areas open to traffic, even in emergencies. When a washout or failure cuts off access, a Surespan bridge and crew can have you moving again fast.

Contact us