WEATHERED STEEL, TIMELESS DESIGN.
Project Type
Structural Steel Fabrication
Location
North Vancouver, BC
Surespan designed, fabricated, and erected a 52-metre, 4-metre-wide corten steel pedestrian truss bridge for the Spirit Trail crossing over Lynn Creek. The bridge’s sweeping arched form and natural weathered-steel finish blend structural engineering with landscape-scale architecture. This project highlights Surespan’s ability to deliver a full design-fabrication-erection package on a striking, community-focused piece of infrastructure.

