MOUNT BRACEY SHORING BOXES

Project Type

Sheet Piling

Location

Bear Lake, BC

Surespan designed, supplied, and installed a 213-metre variable-width sheet pile shoring system to support excavation at a compressor station site, using two cranes and a dedicated crew to meet a tight schedule. Surespan delivered the project ahead of schedule and returned months later to remove the sheet piles.