girder jacking and rivet replacement— on the railway’s schedule.
Project Type
Railway Bridges
Location
Beverly, AB
Surespan completed specialized structural steel rehabilitation and strengthening on the east side of Beverly Bridge, including rivet replacement, girder jacking, localized surface preparation to SSPC-SP3 standards, and installation of retrofit steel members, connection hardware, and replacement bottom flange angles. Surespan provided full labour, equipment, and supervision on a structured crew rotation, coordinating critical activities within authorized work blocks to minimize disruption to rail operations.



