TWO SPANS, ONE FAST RESPONSE
Project Type
Structural Steel Fabrication
Location
Hope, BC
Surespan Structures fabricated and supplied two 137-metre steel girder bridges to replace a collapsed section of the Coquihalla Highway near Hope, BC, totaling 717 metric tonnes of steel. The scope also included precast concrete deck panels for a temporary bridge, keeping this critical highway corridor connected during reconstruction. The project reflects Surespan’s ability to deliver large-scale emergency infrastructure replacement on a demanding timeline.