• ABOUT US
  • SERVICES
    • CONSTRUCTION
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
    • PROJECT & CONSTRUCTION MANAGEMENT
  • PROJECTS
    • CONSTRUCTION
    • WIND
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
  • CAREERS
  • CONTACT
  • ABOUT US
  • SERVICES
    • CONSTRUCTION
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
    • PROJECT & CONSTRUCTION MANAGEMENT
  • PROJECTS
    • CONSTRUCTION
    • WIND
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
  • CAREERS
  • CONTACT

PROJECTS

Sombrio Bridge, Port Renfrew, BC
2012
See all construction projects
See all projects

Surespan was contracted by Windley Contracting to erect and launch the structural steel for the Sombrio #1 Bridge. The bridge consists of 4 girders spanning 407 feet over a 100 foot deep ravine. This launch was particularly interesting as the final stage of the launch saw the structural steel cantilevered over the pier by 268 feet with +/- 640,000 pounds of counterweight sitting on the back of the Steel. A 270 Ton crane was used to lift the structural steel into its final resting place on the abutment.

(604) 998-1133
Copyright 2023  Surespan Group
  • Privacy Policy
  • Terms of Service