• ABOUT US
  • SERVICES
    • CONSTRUCTION
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
    • PROJECT & CONSTRUCTION MANAGEMENT
  • PROJECTS
    • CONSTRUCTION
    • WIND
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
  • CAREERS
  • CONTACT
  • ABOUT US
  • SERVICES
    • CONSTRUCTION
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
    • PROJECT & CONSTRUCTION MANAGEMENT
  • PROJECTS
    • CONSTRUCTION
    • WIND
    • STRUCTURES
    • READY-MIX
    • BRIDGE RENTAL
  • CAREERS
  • CONTACT

PROJECTS

Narrows Inlet Hydro Electric Project – Road and Bridge Phase, Narrows Inlet, BC
2016
See all construction projects
See all projects

Surespan was contracted by BluEarth Reneweables in collaboration with Jim Dent Construction to design, supply, fabricate and install 22 resource bridge structures which would eventually provide access to the 33MW hydo-electric facilty and adjoining assets in the remote Narrows Inlet. Span designs varied from 6m concrete slab structures to 120’ composite clear spans and were installed over a 3 month period.

(604) 998-1133
Copyright 2023  Surespan Group
  • Privacy Policy
  • Terms of Service