After a culvert failure on the primary access point to Kent Institution, Public Works Canada required emergency repairs to the crossing. Surespan Bridge Rental mobilized a 70’ portable bridge allowing for zero traffic delays during the main culvert repair.In addition, Surespan Construction installed the sheet pile wall required to enable dewatering of the work area.