Highway 407 Phase Two Expansion with Blackbird Constructors
Surespan contributed to the Highway 407 Phase Two Expansion, a project led by Blackbird Constructors (a joint venture of Ferrovial Agroman and Dufferin Construction). Since 2015, we’ve deployed our LG1750 cranes and a range of crane packages to handle girder erection along the highway.
To date, we have placed over 450 girders and completed 26 bridges within the large scale project. This involved installing girders weighing up to 87 tons and spanning 49 meters in length. Our team’s expertise in large-scale construction projects and quality control ensured safe and efficient execution throughout.
Regardless of the duration of the project, we make sure to bring these joint projects to reality, solidifying our commitment to quality in the long run.