Surespan acted as a General Contractor on this design bid build project, which included Fisherman’s Trail Bridge – a steel girder bridge with concrete precast deck panels, and Riverside Drive Bridge – a cable suspension bridge spanning the Seymour River in North Vancouver, BC. Surespan also installed a temporary work bridge to facilitate construction.