Underground Transformer Vaults for BC Hydro
In 2013, BC Hydro contracted Surespan to design and manufacture underground transformer and utility vaults. This contract extended in 2016 and continued through to 2020.
These vaults are built to handle heavy loads and a variety of seismic conditions, meeting BC Hydro’s strict quality requirements. Designed to house power supply lines and electrical equipment, they ensure a safe and durable solution for critical infrastructure.
Our focus on quality control supports BC Hydro’s commitment to reliable power systems serving millions within our beautiful province.