Surespan was contracted by BC Hydro to complete design and produce stock underground transformer & utility vaults in 2013. This contract was extended in 2016 to continue into 2020. These components are designed to withstand heavy loads, including seismic conditions. The underground vaults/components are intended to house a variety of power supply lines and electrical equipment. They are built under extremely stringent quality requirements.